How to view summary of Change Orders for one project
This article will guide you through how to view a summary of Change Orders for a specific project on MeasureSquare CRM.
This article applies to MeasureSquare CRM
Steps to View Summary of Change Orders:
- Navigate to the Projects section from the left-hand menu. Select the project you want to view.
- Once inside the project, click on the Dashboard tab located at the top of the project interface. Refer to the red-highlighted area in the screenshot for the location of the Dashboard tab.
- Scroll down to the Change Orders section within the Dashboard. This section displays a summary table with the following details:
- Change Order Number
- Cost
- Sales
- Status
Note: If you need further assistance, contact MeasureSquare Customer Support at +1-626-683-9188 or email support@measuresquare.com.
Related Articles
CRM User Manual: Procurement & Installation, Lesson 5: Change Order Management and Tracking
Change Orders Change Order management can be one of the most impactful—and complex—parts of the project lifecycle. In many cases, it determines the profitability, accuracy, and long-term success of a job. For small retail or residential work, Change ...
How to manage everything in your MeasureSquare CRM project?
In this article, we will cover on how to manage everything inside of your Project View. This article applies to MeasureSquare CRM. Navigate to your desired project in order to have access to your Project View page. Steps to Manage Your MeasureSquare ...
Slab Layout: View Options & Settings
Slab Layout: View Options & Settings Knowledge Base Article | Stone & Tile Desktop Applies to: Stone (Stone Only) and Stone & Tile | Last reviewed: June 2026 Overview The Slab Layout module contains two distinct configuration areas that control how ...
Shop Drawing: Property View
Shop Drawing Template Editor: Property View Knowledge Base Article | Stone & Tile Desktop Applies to: Stone (Stone Only) and Stone & Tile | Last reviewed: June 2026 Overview The Property View is the right-side control panel that appears when you ...
CRM User Manual: Takeoff/Bid Management, Lesson 6: Booking the Project
Booking the Project Once you’ve been awarded a project, it’s time to officially “book” it in MeasureSquare CRM. This process signals that the job is moving forward and activates several backend automations that help your team begin execution. This ...