In this article, we will show you how to document moisture task testing. Most of the work will be documented in the plan view of our project. We will walk you through a simple example of a moisture task testing since that's the first part of the process before we can install our flooring products into our project. You always test the initial condition on the concrete and so forth before you install the flooring.
This article applies to JobTrakr Web
Step 1: Look to the top right, you will see the option Add Task with a little square icon with a check mark and a plus > You will click on it and click on the Moisture button
Step 2: You then can move and left click to place a pin onto an area to start, you will then see a pop up window to enter information. This is where you can set up the initial conditions. This big slider is to set the Max relative humidity (RH) %, you can set up the % for the products or use the information sheet provided by the manufacturer > Click Save when done