How Can You Hide the Cut View on MeasureSquare 8?

How Can You Hide the Cut View on MeasureSquare 8?

This article will show you how to hide the cut sheet view so it does not appear when selecting roll goods. 


This article applies to all MeasureSquare 8 builds. 

Step 1: Locate the drop down menu for the 'Estimate' section.

Step 2: Uncheck the 'Auto Show Cut View'



Once this is unchecked you can then work on your project(s) without worrying about the cut sheet view popping up unless you choose so.

To view a cut sheet without turning this feature back on you can select the 'Show Cut View' option that will appear from the estimation drop down when a room is selected. 













You can manually hide or display the cut sheet by clicking the double arrow symbol as shown in the image below



    • Related Articles

    • How to read the cut tile view for MeasureSquare 8?

      This article will show you how to read the cut tile view option in Meausure Square 8. For All Measure Square 8 Builds What we see below is the hashed areas being used to cut to fit and rotated to lower quanties. >Green arrow is showing us the ...
    • Overview of View Options

      These screenshots show the View Options dropdown menu in MeasureSquare Stone, which controls what information is displayed on your tile layout drawings. How to Access Click the Options button in the View toolbar from the top ribbon After clicking the ...
    • How to Access and Toggle on/off Shop Drawing View Options in MeasureSquare Stone

      This article will show you how to access and toggle on/off View Options for Shop Drawings in MeasureSquare Stone. View Options Click View Options. Each option can be toggled on or off by clicking on it. Additional options -Tags can be toggled on by ...
    • Release Notes for MeasureSquare 8

      For the latest updates visit the weblink below. https://cloud.measuresquare.com/releasehistory 1.0.11.7587 ------------------------- UI Improvement ------------------------- 1. Enhanced the Project Items, it now shows Net Area, Cost Amt, Sales Amt, ...
    • How to View and Create Tasks in MeasureSquare CRM

      In this article, we will cover on how to view and create Tasks within MeasureSquare CRM. This article applies to MeasureSquare CRM. Method 1: Create a Task from a Project Step 1: Navigate to the Project Go to the Projects section in the left-hand ...