This article will go over how to adjust and relocate the column order for your project items list on MeasureSquare 8. 

This article applies to MeasureSquare 8 Build and newer. 

Step 1: Locate the "Project Items" portion on the left side of MeasureSquare 8. 



Step 2: Locate the different columns that you see and right click on the column title. An option will appear for you to select 'Select Columns'. 



Step 3: Your 'Select Columns' pop up will then appear and you will then be able to click and drag the column names to place in your desired location. Once they are in the correct location select 'Ok'. 



You are also able to add new columns for 'Net Area', 'Cost Amt', 'Sales Amt', and 'Profit' by clicking on the selection box. 







    • Related Articles

    • How to Create a Change Order Document in MeasureSquare Bid

      In this article, we will cover how to create a Change Order Document. To watch a video of this tutorial click here This article applies to the MeasureSquare Bid. Download this file here and add it to your MeasureSquare Cloud to follow along For help ...
    • How do I change the order of my tabs on iPad?

      In this article we will show you how to adjust the tab order on the Measure Square Mobile application for iPad. This article applies to Measure Square Mobile for iPad. Open your project and tap on the Tools icon Step 1: Tap on Tabs Step 2: Tap on ...
    • How do I draw a column in MeasureSquare 8?

      In this article, we will show you three ways to draw or represent a column in your takeoff, and what the differences are between them. This article applies to MeasureSquare 8 Build 8941. There are three methods you can draw a column or pillar in your ...
    • How do I draw a column in MeasureSquare 8?

      In this article, we will show you three ways to draw or represent a column in your takeoff, and what the differences are between them. This article applies to MeasureSquare 8 Build 8941. There are three methods you can draw a column or pillar in your ...
    • How to Create Takeoffs for Change Orders in MeasureSquare Bid

      In this article, we will cover the different ways to create change orders in the Takeoff Tab.To watch a video of this tutorial click here 1. Open up the project you want to work on and navigate to Takeoff in the top bar 2. In the Projects page, click ...